The old ventilation unit was replaced with a new heat recovery system equipped ventilation unit. The efficiency of machines is at least 70%. The motivation for the project was to improve the conditions and save energy.
Kindergarten of lakso in ii
The old ventilation unit was replaced with a new heat recovery system equipped ventilation unit. The efficiency of machines is at least 70%. The motivation for the project was to improve the conditions and save energy.
Kindergarten of lakso in ii
Some of the standard seats were replaced with waterless urinals for the men’s toilets in Ii High School and Nättepori. This results […]
Municipality of Ii has been awarded with Hinku-act price for active, long-term and successful work for reducing the greenhouse gases. Ii is […]
A 132 m2 detached house built in 1977 had water radiator heating. It has been transferred to geothermal heating. The collecting circle […]
Remote working hub experiment, Micropolis Approximately 60% of the Ii working residents work outside Ii, especially in the neighboring municipality of Oulu. […]